Search:



The Web

Rediff








Home > Cricket > PTI > Report

Start of tri-series final delayed

August 28, 2004 14:18 IST

The start of the tri-series one-day international cricket final between Australia and Pakistan was delayed due to a damp outfield.

Although the sun was out, the outfield was considerably damp due to rains over the last two days.

After an inspection, the umpires said the match could be delayed by one-and-a-half-hour to let the sunshine dry the outfield.

The match was scheduled to start at 1400 IST.



Article Tools
Email this article
Top emailed links
Print this article
Write us a letter
Discuss this article



Related Stories


Rain ruins India-Australia match

Aus-Pak match abandoned

Aussies reject rescheduling plea








© Copyright 2004 PTI. All rights reserved. Republication or redistribution of PTI content, including by framing or similar means, is expressly prohibited without the prior written consent.











Copyright © 2004 rediff.com India Limited. All Rights Reserved.